Plan the strip-out around the property.
We work across Perth and quote each project around its actual scope and access. The suburb is a starting point; building rules, floor level and the waste route can have a greater effect on the work than distance alone.
Offices and commercial buildings
For Perth office defits and make-good, include the goods-lift dimensions, booking windows, loading-dock access and required protection for common areas. Confirm the landlord’s handover schedule and permitted working hours before agreeing a start date.
Retail premises and shopping centres
For shop strip-outs, send the centre or landlord guidelines along with the demolition drawings. We need to understand the boundaries of the tenancy, neighbouring trading areas, delivery routes and how waste can be taken out. Street-front shops may also have limited loading and parking.
Homes and apartments
For kitchen and residential strip-outs, tell us about stairs, narrow passages, driveway access and rooms that remain occupied. Apartment work also needs the relevant strata access and working-hour requirements. Photos of the work area and the route outside help us assess the removal arrangements.
Mandurah and surrounding areas
Send the site address, approximate area, scope and preferred dates. Travel, equipment and waste arrangements are assessed with the project and included where agreed in the written quote. If your suburb is not listed, contact Lucas to confirm availability for your location.
Standard hours are Monday–Friday, 7am–5pm. After-hours and weekend work needs prior agreement and is quoted separately. Start with photos or drawings; any applicable site-visit fee is confirmed before an appointment.
